When the
dryer is installed be sure to check a good place to be installed, standby equipment to be installed. So as to not appear in the installation other problems in the future use will not be because after the initial installation repair errors caused inconvenience and so on.
Install the main equipment,check the quality and size of the foundation concrete pouring position deviation: base surface appearance requirements clean, free of grease, dust, debris, no steel bare, no cracks chipping, no residues are expected to remain shell hole boards, and other casting defects. For the basis of size and position deviation shall meet the following requirements: Dimensions and basic coordinate position, vertical and horizontal axis error is less than 20mm. Different planes elevation error is less than 20mm, allowing only negative is not allowed; slope length error less than 20mm, to allow the discharge end is not allowed; plane is not on the flatness of less than 5mm / m, total length less than 10mm. Equipment acceptance control equipment packing slips, for parts, components, standard parts, conduct an inventory of random files, check for wrong hair missing, deformation damage etc. And for the record, in order to purchase or preparation prior installation. Clear packaging protective coating and finishing dust, grease, rust etc, check the trimming process in transport handling damage caused by deformation. Of spare parts, the key fitting, pre-testing and pre-assembled in order to avoid rework installation work, ensure the installation progress and quality of the installation.