Effect of feeding rate of brewer's spent grain dryer on drying effect

Date2018-04-24 Back To List
The speed of the material flow in the drying drum during the operation of the brewer's spent grain dryer directly affects the entire drying process. Dingli designed the flow velocity according to the actual requirements of material drying. If it is too slow, the drying time is long. If it is too fast, the drying effect is not good, and the heat exchange with the heat source does not sufficiently affect the dehydration rate, so brewer's spent grain dryer proper control of the material flow rate is an important step to complete the drying work.
It adopts downstream drying, a new type of raising material system structure and an insulation system. Dingli achieve heat exchange and thermal conversion, improve heat utilization efficiency and drying efficiency, according to the customer's specific requirements for environmental protection indicators, the matching of the dust collector is selected, and the exhaust gas temperature and exhaust gas dust emission concentration are reduced, so as to ensure that the purpose of energy conservation, emission reduction and green environmental protection.  If you are interested in our comapny of products, hurry up to Dingli inquiry and order.

RECENT CASES

View More

COMPANY NEWS

View More

READ OUR FAQ

  • What is the process for purchasing equipment?

    Contact customer service - understand the basic situation - equipment quota-tion - sign contract - equipment production

  • What is the Quality of your products?

    Dingli Group products come with best quality, and our products passed CE certification, exported to lots countries around the word, such as Australia, Malaysia, India, Italy ,Indonesia, Vietnam, Philippines, Korea, Brazil, Argentina, Russia, South Africa, etc. You can rest assured with the quality absolutely.

  • What is the Installation of your products?

    Dingli Group has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for technicians' round way air tickets, food and lodging, most importantly to guarantee the technicians' safety.

  • What is the raw material for the production line? What is the capacity per hour you required?What is the maximum input size of the raw material?What is the output size and application for the final product?

    You can send inquiries from this page.Once we get your answers,we can provide you the best quotation immediately. Remarks: The price will depend on different models.

GET IN TOUCH WITH US