How to dehydrate and dry grass is more economical?

Date2020-07-27 Back To List

     How to dehydrate and dry grass is more economical? This is what every forage dryer manufacturer wants to achieve, and is also the core competitiveness of forage dryer manufacturers. Forage dehydration and drying generally have two methods: natural drying and mechanical drying. Which method is more economical?

菲律宾草烘干机.2.jpg

    Natural drying of pastures requires that the pasture grassland be spread out or placed on the grass shelf for drying, which has high requirements on the site and weather, high labor costs, and is suitable for small-scale pasture dehydration and drying. While forage machinery drying only need one forage dryer. The output of this type of mechanical equipment is not limited, the carrying capacity is large, and it can work for 8 hours or more than 10 hours. It covers a small area and is not affected by the weather, only two or three people are required, the labor cost is small. Moreover, the nutrients in the forage after drying are well preserved.

    Zhengzhou Dingli specializes in the production of forage dryer equipment. The company provides free forage drying technical solutions, installation and technical commissioning to ensure the safety of production lines, timely production and continuous operation.

RECENT CASES

View More

COMPANY NEWS

View More

READ OUR FAQ

  • What is the process for purchasing equipment?

    Contact customer service - understand the basic situation - equipment quota-tion - sign contract - equipment production

  • What is the Quality of your products?

    Dingli Group products come with best quality, and our products passed CE certification, exported to lots countries around the word, such as Australia, Malaysia, India, Italy ,Indonesia, Vietnam, Philippines, Korea, Brazil, Argentina, Russia, South Africa, etc. You can rest assured with the quality absolutely.

  • What is the Installation of your products?

    Dingli Group has several experienced technicians with passports ready to go for installation, when installation service is needed, the client should pay for technicians' round way air tickets, food and lodging, most importantly to guarantee the technicians' safety.

  • What is the raw material for the production line? What is the capacity per hour you required?What is the maximum input size of the raw material?What is the output size and application for the final product?

    You can send inquiries from this page.Once we get your answers,we can provide you the best quotation immediately. Remarks: The price will depend on different models.

GET IN TOUCH WITH US